A line extension is the extension of primary electric
facilities to the customer's property, subdivision or
commercial building. If Chugach does not have a power
source adjacent to the customer's property, a line extension
may be required. In some cases, existing Chugach facilities
may be inadequate and upgrading will be required. For
additional clarification, contact Chugach at 762-4631.
Customers should contact Chugach for information on the cost
of extending electric facilities. Chugach may ask for a site
plan of your property, and a deposit is required to begin
the review and design process for extending electrical
facilities. Chugach's tariff will be discussed with the
customer as to the fees Chugach contributes, and the cost
the customer pays for the extension of electric facilities
to the customer's property. Outlined below is the process
for obtaining a line extension.
Bid Process
Projects under $24,000 utilize a unit price task order
contract, and no bid is required. Projects over $24,000
are normally sent to bid every Tuesday to Chugach's approved
contractors. Bids are generally received back the following
Tuesday. The customer should have the property at final grade,
and the easements free from obstructions (i.e., gravel,
debris, old cars, etc.) prior to the start of construction.
Back to top
Applying for Service
Before the project is complete, the Customer will need to
contact Chugach's Member Services Department at 563-7366 to
establish a member account for service. If the customer is
not already a Chugach member, an application will need to
be completed. A Chugach approved meter base, inspected by
the Municipality, will need to be provided by the customer.
Note 1. Line extensions involve construction of poles and
overhead lines or installation of trench and cables and other
facilities to bring power to your property, subdivision or
commercial building. A secondary service connection links
the meter in your new house, apartment or business to the
power line.
Note 2. The length of time it will take Chugach to design,
bid and construct your project will depend on, but is not
limited to the following: type of the line extension
(single-phase, three-phase, residential, commercial),
size of the extension, availability of easements and permits,
time of year, changes to building design by customer,
execution of a line extension agreement (signed contract),
and receipt of any required customer contributions.
Note 3. If the customer's project plans change at any time,
it may have an impact on Chugach's design and subsequent
construction schedule. The customer should notify Chugach
immediately. Redesign by Chugach may be required and a
redesign fee may be incurred by the customer. Changes to
design can impact the time it takes to complete your line
extension. If the customer requires a project to be re-bid,
a re-bid charge will be incurred.